
TLD Flowline SE Mips Helmet - Radian Burgundy/Charcoal -
Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.
SPECIFICATIONS
- 3-Way adjustable screwless visor
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Fidlock® Magnetic Buckle System
- Dual Density EPS for low and high-speed impacts
- Anti-microbial Quick Dry Premium Liner
- Side strap adjusters
Original: $115.45
-65%$115.45
$40.41Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.
SPECIFICATIONS
- 3-Way adjustable screwless visor
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Fidlock® Magnetic Buckle System
- Dual Density EPS for low and high-speed impacts
- Anti-microbial Quick Dry Premium Liner
- Side strap adjusters















